Spring 2021: Shoreline Trail Makeover
May 16, 2019
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Read more about Spring 2021: Shoreline Trail MakeoverMay 16, 2019
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Read more about Spring 2021: Shoreline Trail MakeoverA section of N. San Pedro Road, just west of Buckeye Point, will be undergoing construction. From Saturday, May 16, through Monday, May 25, the road will be open but reduced to one lane at the construction site, with traffic controlled by a metered light. Please allow a few extra minutes for possible delays.
